Description
Product details:
Materil: Nylon+ Reflective stripe
Feature:Reflective, Soft ,Comfort, Durable, Elastic.
Size: Length is 150cm(59″)
Specifications:
1.There are 5 colours to choose. Black,Blue,Pink,Orange and Green. Beauty and fashion.
2.Handle with padded is very soft,which could protects your hand from rope burn. Comfort handle is 13 inch long, 1 inch diameter.
3.Good grip and excellent elastic feeling.No rope burns.
4.Durable cover,durable metal clip hook,high-quality climbing nylon rope, which all could make sure the life of the leash.
5.The rope is round, thick thread ,extremly durable against constant chewing.
6.The reflective strip can make sure your pet safe when you running or walking with pet at night.
7.Support drop shipping.
Notes:
1.Please note the photo does not show actual size,please refer to description size details.
2.Please allowed 1-3mm differences due to manual measurement, thanks.
3.Due to the difference between different monitors, the picture may not reflect the actual color of the item.
4.Please allow slight dimension difference due to different manual measurement.
Thanks for your understanding!
Reviews
There are no reviews yet.