Sale!

Large Dog Nylon Leash Reflective Traction Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Big Dog

$16.08

BlackBluecoffeePinkRed
ChinaUnited States
Clear
SKU: 4000258821183 Category:

Description

Product Description:
Item Type:Pet Leash
Material:Synthetic Fibers
Color:Blue,Brown,Red,Pink,Black
Feature:Durable
Target Audience:Dogs
Size:150cm/59.06″*1.2cm/0.47″

Features:
1. Made of high-quality material, the handle is elastic and comfortable in hands.
2. It is thick and not easy to break, durable and has a smooth surface.
3. The durable clasp can be suitable for all kinds of collars, convenient to use.
4. It is reflective to ensure the safety of the night walking.
5. There are various colors for choosing.

Package Include:
1 x dog leash

Additional information

Brand Name

TAILUP

Dog Leash Type

Basic Leashes

Pattern

striped

Feature

Reflective

Season

All seasons

Type

Dogs

Material

NYLON

Reviews

There are no reviews yet.

Be the first to review “Large Dog Nylon Leash Reflective Traction Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope For Big Dog”

Your email address will not be published. Required fields are marked *