Sale!

FML Pet Leashes Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope for Dogs

$26.97

BlackBlueGreenNavy BluePinkRed
1.2x150cm
Clear
SKU: 33010949405 Category:

Description

modname=ckeditor

Type: Reflective Dog Leash Nylon with Handle

Size: 1.2cm*150cm

FOAM HANDLE: no rope burns anymore, the Ladoogo dog leash inspired from fitness facility to added an ergonomic and comfortable foam handle that helps you maintain firm and comfortable grip without digging into your hands even when your dog pulls hardly

DURABILITY: Made of strong 1/2-inch diameter rock climbing rope and durable 360 degree tangle free and rustproof swivel hook that are stronger than other standard dog leashes

REFLECTIVE: Highly reflective threads keep high visibility at night for safety